"景先生毕设|www.jxszl.com

基于工程量清单计价模式的投标文件以君悦2号楼为例【字数:14584】

2024-11-24 15:50编辑: www.jxszl.com景先生毕设

目录
摘 要 2
ABSTRACT 3
第一章 文献综述 4
1研究背景 4
2招投标国内外研究现状 4
3工程量清单计价模式 6
引言
1设计准备 7
2设计工作 11
第三章 结果 18
1施工进度安排 18
1.1施工进度计算 18
1.2施工进度计划甘特图 22
2施工现场平面布置 23
第四章 招投标文件编制和总结分析 24
第五章 报价策略分析 26
参考文献 26
附 录 27
致 谢 28
基于工程量清单计价模式的投标文件编制——以君悦2号楼为例
摘 要
COMPILATION OF BIDDING DOCUMENTS BASED ON THE VALUATION MODEL OF BILL OF QUANTITIES A CASE STUDY OF JUNYUE NO.2 BUILDING
ABSTRACT
The title of this graduation project is the preparation of bidding documents based on the valuation model of bill of quantities a case study of Jiangxi Grand Hyatt International Building 2. The graduation design drawing comes from the actual engineering project Jiangxi Grand Hyatt International No. 2 Building CAD drawing. By using the Glodon BIM civil engineering measurement platform (GTJ2021) of Glodon Company to draw the steel bar and civil engi *51今日免费论文网|www.51jrft.com +Q: ¥351916072
neering model of the construction project, the 3D model is formed and the corresponding project quantity summary table is obtained. After import visionbank of cloud (GCCP6.0) bill of quantities valuation platform, then to 2017 in jiangxi province quota calculation offer, the final construction schedule arrangement and construction site layout, choose according to the bid for the project tender offer strategy, and will prepare the results through the comparative analysis with the actual project, bidding strategies research, An appropriate bidding strategy has been proposed to increase the probability of winning the bid, with the aim of producing a complete tender document. Through this graduation project, it aims to understand the composition of bidding documents and the complete process of preparing bidding documents, and study the bidding document quotation strategy and skills. By comprehensively applying the knowledge learned in the four years of engineering management major and combining theory with practice, this graduation project can apply the acquired experience and skills to the subsequent work and study.
KEY WORDS:Bidding; Bill of quantities valuation model; BIM and Wanda; Quotation strategy
文献综述
1 研究背景
现如今随着现代工业技术的不断发展,世界经济水平不断提高,中国乃至国内外经济发展迅猛,人民生活水平不断提高,人们对于幸福生活的要求越来越高,建筑涉及人们生活,因此在建筑方面的建设越来越变成一个重要的方面。建筑方面的发展经历了从计划经济到市场经济的转变,由原来的重重限制转变为自由发展的市场竞争经济,在招投标方面的发展亦是如此,随着我国经济的发展,招投标逐渐转变为公平公正的市场交易[]。
2 招投标国内外研究现状

原文链接:http://www.jxszl.com/jmgl/gcgl/609310.html